☰
CLIENT: Gosford City Council This stormwater drainage and road reconstruction project was for the supply and installation of 360 lineal metres of RCP’s ranging in size from 375 dia to 900 dia, pit construction, 240 metres of road reconstruction and associated works.The aim of the project was to improve the street drainage system to eliminate property flooding downstream of Parry Ave. The existing drainage system was extended to improve collection with kerb and gutter installed to collect stormwater flows and direct it to the collection pits. The works involved the reconstruction of part of Parry Ave. The scope included: