Greenway Memorial Garden

CLIENT: Palmdale Group

This Tuscan style courtyard was constructed as part of the memorial gardens at the Greenway Memorial Park. It is a private space created by perimeter walls and gardens with a reflection pool water feature. The scope includes:

Kibble Park

CLIENT: Gosford City Council

As part of the Kibble Park upgrade, Scape was contracted to carry out the upgrade to the existing café building and landscape the entire park. New rendered paint finish to external walls, decking, sails, enclosures and landscaping transferred this old building into modern café which compliments the newly landscaped surrounds. The landscape features provide covered seating, new play area, a rock lined shallow stream and shady open space areas.  The works included:

Tarraleah Park

CLIENT: Tarraleah Performance Horses

This property has been transformed from a lazy rural property into a world class equestrian training / breeding facility. Scape was contracted to carry out paddock construction, drainage, roadworks, pavements, building foundations and flooring, retaining, landscaping and maintenance. This quality project once again incorporated a range of works through excavation, civil and landscaping.

The Grove, Palmdale Memorial Gardens

CLIENT: Palmdale Group

The Grove is part of the memorial gardens at Palmdale Memorial Park. Scape was contracted to create memorial gardens and paths with a central waterfall and pond feature. The pond is self-filtering, is a heavily reinforced concrete structure and has a flow of water cascading over the rocks at 300 litres per second. Scape also installed surrounding landscaping &planting and a large reflection pond. Works include:

 

North Shelly Beach Stair

CLIENT: Wyong Shire Council

Scape was engaged to construct composite fibre and recycled plastic stairs and strip footings, piles, framing, stairs and handrails and restoration of the site. The new stairs provide access for the community to North Shelly Beach.The structure called for strip footings, a composite fibre frame and recycled plastic stairs. The levels of the dune also needed to be reshaped to match the proposed design levels.The scope of the work under the contract included the following:

Parry Ave Drainage Improvement Works

CLIENT: Gosford City Council This stormwater drainage and road reconstruction project was for the supply and installation of 360 lineal metres of RCP’s ranging in size from 375 dia to 900 dia, pit construction, 240 metres of road reconstruction and associated works.The aim of the project was to improve the street drainage system to eliminate property flooding downstream of Parry Ave. The existing drainage system was extended to improve collection with kerb and gutter installed to collect stormwater flows and direct it to the collection pits. The works involved the reconstruction of part of Parry Ave. The scope included:

Glengara Retirement Village Subdivision

CLIENT: Retire Australia

Scape was engaged to construct a residential subdivision in Jaeger Rd incorporating land clearing, bulk and detailed earthworks, retaining walls, roads, footpaths, water mains, gas mains, fire service, sewer, stormwater, drainage channels and wetlands, pedestrian bridge and landscaping.

The site is surrounded by wetlands which required unique environmental management techniques. Project scope included:

Mudflat Creek Stage 3 Drainage

CLIENT: Gosford City Council

The drainage works performed for Gosford City Council required dredging, widening and rock lining of approximately 85 metres of Mudflat Creek, upstream of Noble Rd, Killcare.

The project required extensive environmental management as the works were undertaken in an active waterway and were affected by tidal movements, inclement weather and continual creek flows.

The scope included:

 

Merewether Public Domain

CLIENT: Newcastle City Council

Scape Constructions was engaged by Newcastle City Council to carry out works in Merewether Public Domain to widen the shared pathway, and provide a new viewing promenade. The works included realignment of the road corridor at the southern end of John Parade, and replacement of the existing pedestrian path and edge beam.

 

The works which formed the basis of the contract are as follows:

Park on the Hill

CLIENT: University of Newcastle

The Park on the Hill project creates a series of linked social spaces within an existing car park at the University of Newcastle. The project plays an important role within the University and in particular the Hunter side of Campus, by creating a lively ‘Student Social Precinct’.The civil & landscape works included the following main elements and scope:

<
<

GET IN TOUCH WITH US

    You are welcome to contact us on (02) 4384 4376 and see how we can lighten the load on your construction project.

    Postal Address

    Scape Constructions
    PO Box 1167, Terrigal NSW 2260

    Office Address

    C204, 6 Pine Tree Lane
    Terrigal NSW 2260

    Get Social

    © 2023 All rights reserved. | Privacy policy