Forresters Beach Retirement Village

CLIENT: Retire Australia

Retire Australia engaged Scape to design and construct landscaping around stormwater catchment ponds and dam which could also incorporate recreational features for future and existing residents. The works were part of a brief associated with a new housing stage and community centre for the village. The aim was to make the dam landscape a focal point of the village and turn the water catchment into an aesthetically pleasing selling point. Scape Constructions also executed all roads, infrastructure, water features, paving, pathways, retaining walls and dwelling landscaping for enhanced outdoor living.

The site is set on 40,000sqm and required major civil works which included:

  • Major subdivision works
  • Landscaping works
  • Road installation
  • Excavations, drainage, kerb & gutters, asphalting & paving thresholds
  • Concreting works including shared pathway and footpaths
  • Dam installation
  • Services installation
  • Extensive retaining walls
  • Boundary wall construction

GET IN TOUCH WITH US