Avoca Beach Southern Foreshore Redevelopment

CLIENT: Central Coast Council

Avoca Beach foreshore is one of the Central Coast’s most popular tourist destinations and is also highly utilised by the local community year round. The works were undertaken as a result of the desire from the Avoca community to improve the infrastructure and amenity of the area as well as to carry out important coastal protection and rehabilitation works to stabilise the foreshore.

 

Scape undertook construction of revetment wall and stormwater drainage at the eastern end of Avoca Beach Southern Foreshore. The project included:

  • Construction of approx. 90 meters of rock revetment,
  • Installation of 55Lm of 3600W x 1200H box culverts, and
  • Installation of 45Lm of 1200mm RCP
  • Stormwater redirection
  • Detailed Excavation
  • Environmental protection and controls
  • Rock revetment works

 

GET IN TOUCH WITH US